B次元官网网址

Skip to content

Gas service line struck during construction work in Langford

The damage has left eight customers in the area without service
241118brynmaurroad
A gas service line was struck on Bryn Maur Road on Nov. 18.

A Langford gas service line was damaged during construction works on Monday (Nov. 18), says Fortis BC.

According to a spokesperson for Fortis BC, the damage left eight customers in the area without service.

The incident occurred on Bryn Maur Road before 9 a.m., a repair crew was on site shortly after, with the gas under control by 9.40 a.m.

Fortis BC estimate the repairs will be completed by midday, with no additional traffic closures in place.



About the Author: Goldstream B次元官网网址 Gazette Staff

Read more



(or

B次元官网网址

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }