Despite the potholes in our streets, cracked sidewalks, and flooding basements; a $650 million estimate for infrastructure renewal; and the chief engineerB次元官网网址檚 report stating, B次元官网网址淎 growing percentage of the districtB次元官网网址檚 infrastructure is failing at an increasing rate,B次元官网网址 only three prospective candidates consider addressing our B次元官网网址渃rumbling infrastructureB次元官网网址 a priority, according to the Sept. 27 Oak Bay B次元官网网址.
Read more >