B次元官网网址

Skip to content

POLL: Do you think the province should begin work on an alternate route to the Malahat?

The torrential rains may have passed, but the aftermath has left many Greater Victoria residents feeling cut off from the rest of the Island.
27219495_web1_211116-GNG-NewMalahat-photo_1
Emergency crews begin work on a flood-damaged single-lane section of the Malahat Drive on Highway 1. (BC Transportation)

The torrential rains may have passed, but the aftermath has left many Greater Victoria residents feeling cut off from the rest of the Island.

MondayB次元官网网址檚 rainstorm, which saw 88 millimetres fall on the Malahat, washed out a section of the Trans-Canada Highway, closing off the road between West Shore Parkway and Tunnel Hill. The road reopened Tuesday to single-lane alternating north and southbound traffic with nightly closures in effect from 6 p.m. to 6 a.m. through Monday, Nov. 22 to allow crews to repair the damage.

ALSO READ:

Apart from the commuter chaos, the closure also led to lineups at the gas pumps and grocery stores with residents concerned over supply shortages.

The closure has breathed new life into calls for an alternate route to southern Vancouver Island. With commuters facing lengthy waits for the Mill Bay ferry or a 236-kilometre route through Port Renfrew and Lake Cowichan, a local transportation planner says the time has come for a bypass to the Malahat.

CRD traffic commission board member Chris Foord has been calling for the construction of a larger highway from Langford to the southern end of NanaimoB次元官网网址檚 parkway for three decades.

B次元官网网址淚 always figured it was going to take a bit of a rockslide or a minor earthquake to close the Malahat for a month, so we could decide how important it is to have a viable link,B次元官网网址 he said about the section of road used by as many as 25,000 vehicles a day.

ALSO READ:

He said emergency bypass routes would work best in the short term while a new highway corridor is the long-term answer.

Expanding the single-lane section of the Malahat at the south end, however, would require construction into the watershed east of the existing highway. The prospect was debated and shut down by the regional water supply commission in 2019.

But Foord said watersheds, which comprise most of Canada, shouldnB次元官网网址檛 keep the province from developing a more reliable route. B次元官网网址淚f we were in Denmark, they would just bore a tunnel through it and think nothing of it. If (it were) Norway, there would have been a high-level bridge across and they would have thought nothing of it,B次元官网网址 he said.

Do you think the province should begin work on an alternate route to the Malahat? Take our poll and let us know.


Do you have a story tip? Email: vnc.editorial@blackpress.ca.

Follow us on and and like us on



About the Author: Greater Victoria B次元官网网址 Staff

Read more



(or

B次元官网网址

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }