B次元官网网址

Skip to content

Saanich estimates 4-year timetable for Nellie McClung build

Project to redevelop the Nellie McClung library into 18-storey building with affordable rental on top and larger library on the bottom expected to take until 2028
mcclung2
The Nellie McClung Library is to be torn down. An 18-storey affordable rental housing development with a new library on the bottom floors is planned to take its place.

Saanich has released a rough timetable for the Nellie McClung affordable housing project after the project received final approval for rezoning by the district council on June 17.

According to a press release from the district, the design phase for the project is supposed to take place this summer and fall, with demolition and construction to happen between 2025 and 2028.

The plan is for a new library to be built on the bottom floors of a building that will be up to 18 storeys and have up to 210 units of affordable rental housing. The new library is planned to be between 25,000 and 30,000 square feet, or roughly double the size of the current facility.

B次元官网网址淭his is a first-of-its-kind project for Saanich using district property to build affordable housing, and council couldnB次元官网网址檛 be more excited about it,B次元官网网址 Mayor Dean Murdock said in the news release from the district.

The building's units would be split up into different affordability levels, ranging from deep-subsidy units to mid-level market-rate rentals. The plan is for 70 per cent of the apartments to be offered as rent-geared-to-income units, and a funding agreement stipulated they must stay that way for 60 years or the life of the building, whichever is less.

District staff are currently working on finding a temporary site for the library to relocate to while construction is underway.

"We will work closely with the District of Saanich to ensure minimal disruption for our patrons during this transition," said Andrew Appleton, Greater Victoria Public Library Board Chair, through the news release.

The rezoning B次元官网网址 passed unanimously by council B次元官网网址 does not issue a development or building permit. Those decisions will need to be made later in the process.

Breaking B次元官网网址 You Need To Know

Sign up for a free account today and start receiving our exclusive newsletters.

Sign Up with google Sign Up with facebook

This site is protected by reCAPTCHA and the Google and apply.

Reset your password

This site is protected by reCAPTCHA and the Google and apply.

A link has been emailed to you - check your inbox.



Don't have an account? Click here to sign up


About the Author: Saanich B次元官网网址 Staff

Read more



(or

B次元官网网址

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }