B次元官网网址

Skip to content

B.C. employers blindsided by construction union raiding changes

Site C, Trans Mountain and LNG Canada all open-shop projects
28729418_web1_20220407-BPD-TransMtn-Blue-River-dec21
Trans Mountain pipeline twinning work continues in December 2021 near Blue River on B.C. Highway 5, about halfway between Kamloops and Jasper, Alberta. (Trans Mountain photo)

B.C.B次元官网网址檚 biggest construction projects, LNG Canada, the Site C dam and the Trans Mountain pipeline expansion, are all open-shop work sites, with non-union, independent union and traditional building trades represented to get them built despite a growing skilled labour shortage.

Easier union certification and raiding drives allowed every summer are aimed at these and future projects, as the B.C. NDP government attempts to restore the dominance of traditional U.S.-based unions in heavy construction. Non-union and independent contracting is now up to about 80 per cent of the B.C. construction industry.

B.C. business organizations are registering their protests to the NDP government shutting them out of discussions on an abrupt rewrite of labour law to remove secret-ballot voting from union certification and allowing annual union raiding in construction work. Labour Minister Harry Bains re-introduced the changes in the B.C. legislature this week, after they were rejected by former B.C. Green Party leader Andrew Weaver in the 2019 minority government.

Leaders of the B.C. Chamber of Commerce, Business Council of B.C., the Canadian Federation of Independent Business, Greater Vancouver Board of Trade and Surrey Board of Trade issued a statement April 7, saying Bains acted B次元官网网址渨ithout any meaningful consultation with employers, and at a time when businesses are still reeling from the pandemic.B次元官网网址

They noted that BainsB次元官网网址 mandate letter from Premier John Horgan, issued after the 2020 snap election that gave the NDP a majority, directs Bains to B次元官网网址渃reate new consultative mechanisms to engage employer and worker representatives in consideration of any changes proposed to workplace legislation to ensure the widest possible support.B次元官网网址

The uncertainty of annual union raids affects not just the multi-billion-dollar heavy construction projects now underway, says Paul de Jong, president of the . Those projects are too far along to stop, but future investments are not.

B次元官网网址淚f you are a greenfield LNG investor, looking at LNG Canada and the relative success that itB次元官网网址檚 demonstrating in building this project, and you see these headwinds of environmental protests, regulatory fog, and now labour relations complications, you being to say, this is just too much,B次元官网网址 de Jong said in an interview.

RELATED:

RELATED:

Bains cited incidents of employer intimidation and interference in union organizing drives, such as at a StarbuckB次元官网网址檚 coffee shop in Victoria as a reason for moving to a B次元官网网址渃ard-checkB次元官网网址 certification system where 55 per cent of employees sign up with union organizers. Current B.C. labour law requires a secret-ballot vote after 45 per cent of employees are signed up.

B次元官网网址淭he current two-step system can lead to interference in organizing,B次元官网网址 Bains said.

B.C. Liberal leader Kevin Falcon said the Labour Relations Board already oversees union certifications, and if an employer is found to be threatening layoffs or firing pro-union staff, the board orders a certification. The changes will have B次元官网网址渁 broad, negative ripple effect right across the business communityB次元官网网址 after two years of COVID-19 pandemic restrictions, Falcon said.



tfletcher@blackpress.ca

Like us on and follow us on .





(or

B次元官网网址

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }